You are here: Other topics > Sched > Unmine Block
GEOVIA Surpac

Unmine Block

You can use this function to redo or unwind any part of the mining schedule.

Function Name:

  • UNMINE BLOCK

You will be prompted to select a block (one already sequenced) to rewind the schedule back to the block which was sequenced immediately prior to the identified block. In other words, all blocks up to and including the selected block will be removed from the current schedule. If the selected block belongs to a different period, the current period is reset as well and scheduling commences from there. The histograms will also be redrawn to reflect the current sequence.