Period Report
This function produces a mining schedule for each period scheduled and a summary report for each period.
Function Name:
Fields on the Scheduler report filename form
Report Location Name
Enter the file name to be used to store the report output. Each individual period report is named '"output file name"NNN.not' where NNN is the period number. The summary report is named '"output file name"99999.not'.
Result
sched_db DATABASE 27-May-94 Mining Schedule for Period 1 SEQU. BENCH QUANTITY TONNES Au ---------------------------------------------------- 1 475.000 MILL 15 1.080 SKPL 0 .000 WASTE 42702 .000 2 475.000 MILL 4381 2.428 SKPL 6524 .922 WASTE 82681 .000 3 475.000 MILL 5365 3.207 SKPL 7472 .745 WASTE 74789 .000 4 475.000 MILL 0 .000 SKPL 204 .810 WASTE 47989 .000 5 470.000 MILL 0 .000 SKPL 0 .000 WASTE 33273 .000 ---------------------------------------------------- TOTALS MILL 9760 2.854 SKPL 14201 .828 WASTE 281434 .000 ---------------------------------------------------- |