You are here: Other topics > Sched > Bench Report
GEOVIA Surpac

Bench Report

This function produces a mining schedule for each layer sequenced. These reports are designed to be incorporated into the plots produced from the output of Sequence Plot to give a complete bench sequence report.

Function Name:

  • BENCH REPORT
Fields on the Scheduler report filename form

Report Location Name

Enter the file name to be used to store the report output.

Result

          sched_db DATABASE     27-May-94  
          Mining Schedule for Bench    475.000      
 PERIOD    SEQ.   QUANTITY          TONNES        Au
----------------------------------------------------
    1         1   MILL                  15     1.080
                  SKPL                   0      .000
                  WASTE              42702      .000
 
    1         2   MILL                4381     2.428
                  SKPL                6524      .922
                  WASTE              82681      .000
 
    1         3   MILL                5365     3.207
                  SKPL                7472      .745
                  WASTE              74789      .000
 
    1         4   MILL                   0      .000
                  SKPL                 204      .810
                  WASTE              47989      .000
----------------------------------------------------
 TOTALS           MILL                9760     2.854
                  SKPL               14201      .828
                  WASTE             248161      .000
----------------------------------------------------