Bench Report
This function produces a mining schedule for each layer sequenced. These reports are designed to be incorporated into the plots produced from the output of Sequence Plot to give a complete bench sequence report.
Function Name:
Fields on the Scheduler report filename form
Report Location Name
Enter the file name to be used to store the report output.
Result
sched_db DATABASE 27-May-94 Mining Schedule for Bench 475.000 PERIOD SEQ. QUANTITY TONNES Au ---------------------------------------------------- 1 1 MILL 15 1.080 SKPL 0 .000 WASTE 42702 .000 1 2 MILL 4381 2.428 SKPL 6524 .922 WASTE 82681 .000 1 3 MILL 5365 3.207 SKPL 7472 .745 WASTE 74789 .000 1 4 MILL 0 .000 SKPL 204 .810 WASTE 47989 .000 ---------------------------------------------------- TOTALS MILL 9760 2.854 SKPL 14201 .828 WASTE 248161 .000 ---------------------------------------------------- |