Add Period
Function Name:
- ADD TO PERIOD
Add Period will continue scheduling blocks from where you left off when last using the selected period number. If the Period number selected is not the last period in which blocks have been sequenced, then all periods after this one are deleted. For example, if there have been 5 periods which have been scheduled and you choose to add to period number 3 then periods 4 and 5 are removed and sequencing can continue from the last block that was sequenced in period 3.
This function is chosen automatically for you as part of the SEQUENCE BLOCKS initialisation process with the last period number that was used in the previous session displayed as the default period number, to allow you to continue scheduling from where you left off in the last session.
Fields on the SELECT SEQUENCE PERIOD form.
Period Number
Enter the period number to continue scheduling from. Blocks already sequenced in the selected period are retained and sequencing continues from this point and all periods after this one that have been previously scheduled are deleted.